Either expansion bolts or epoxy can be used in this scenario.
Ledger bolts roof.
The bolt pattern must be clearly thought out 5 06 considering a 2x10 ledger and a 2x10 band joist as an example let s start at the beginning.
Spacing for bolts and lags used to connect the deck ledger to the building are shown in the table at above right ledger bolted directly to the building and at in the figure at left for deck ledgers that are spaced away from the building.
You will usually need the length of the bolt to be at least 4 6 to penetrate through the 2x ledger board the house sheathing and into the solid house rim.
The most common method is to install lag bolts with washers or carriage bolts with washers.
Standard galvanized lags and carriage bolts.
Plus you need to double fasteners at ledger butts and ends.
Bolts and screws must be located 2 in.
Push or hammer the ledger back onto the bolts recheck for level making any needed adjustments add washers and nuts and then tighten the bolts.
Although more work it is absolutely a bullet proof solution.
The table includes in.
That distance varies depending on the ledger size.
Never counter sink bolts.
X 9 in.
Douglas fir lvl no attachment is allowed to strand lumber syp lvl the mudsill i joists floor trusses or other materials.
If metal flashing is used holes must be drilled through the metal prior to drilling out the concrete.
For a 2x8 ledger the bolt must be at least 5 1 2 inches from the top of the ledger 4 1 2 inches is the minimum when the ledger attaches to a 2x8 band joist.
The first bolt goes in from the end at least 2 inches and not more than five.
Remove the ledger and drill bolt holes where the bolt tips have left marks.
Table of bolt spacing for deck ledger spaced away from the building.
House rim joist must be minimum of 2x sawn lumber or 1 in.
For this reason structural screw manufacturers that market fasteners specifically designed for ledger connections provide engineered fastener patterns and load tables and these are the ones you must use.
For a really durable job consider applying 30 felt paper or metal flashing between the ledger and the concrete.
The bottom bolt must be a minimum distance from the top of the ledger.
Bolt spacing when the ledger is spaced away from the wall sheathing using stacks of washers.
The ledger basically hangs on the top bolts but sits atop the bottom bolts so more space is allowwed.
Even if the screw were magically invincible more structural screws would be required than lag screws to provide the same load bearing capacity.
Down from top and up from bottom of ledger and staggered up down.
Spacing ledgers off the wall has been a code accepted practice since the 2009 when the international residential code irc included a prescriptive ledger fastening table for in.
Flashing a patio roof ledger.