If it is only 1 to 2 inches out of level this should not matter because most starter strip is 3 1 2.
Leveling siding starter strip.
A hand level won t cut it and how do you level a chalk line.
Remember to make sure the sheathing is smooth before you apply the siding so the siding can be smooth also.
Pull a measurement down from the soffit.
What is the best way to determine a level line on the exterior of your house over 20 to 50 feet.
Georgia pacific 3 5 in x 10 ft galvanized steel galvanized steel vinyl siding starter strip.
This way you will always end level with your soffit.
It s designed to work with most sidings.
A water level is simply a clear plastic hose or regular hose with clear ends with water in it.
A line level isn t accurate enough.
Required accessory for starting a vinyl siding job constructed of low maintenance durable vinyl.
Family handyman use the wider starter strip the bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Starter strip is used at the bottom of each side of the home to lock the first course of siding in place.
To establish a level line around a building you ll need a surveyor s level an accurate laser level or a water level.
Then find your lowest point of the home.
For the remaining vinyl siding panels to be installed correct and level beginning with the lowest row you must install the starter strip correctly.
Vinyl siding starter strips.
This is where the new siding will begin.
You attach the bottom of the first row of siding to the top of this starter strip.
Description documents this vinyl starter strip is used prior to installing the first row of siding and helps keep siding level and straight.
Pull this same measurement on each corner.
It protects the sheathing from rain snow and pests.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Below the top of the foundation but the lower the vinyl siding is installed the better.